Our history

St Clare's began in 1971, when a new school and a new parish were started together in Fulwood. This is how it grew from Mass in parishioners' homes to the church we gather in today.

  1. December 1967

    The land is bought

    The land for the future parish was purchased by Fr Pearson from Mr J. Moon.

  2. 29 March 1971

    A school called St Clare's

    The Secretary of State for Education and Science directed that a Roman Catholic primary school be established in the Urban District of Fulwood and be called St Clare's.

    The name was chosen by Fr Francis Worden, Parish Priest of Our Lady and St Edward's, because a parish had not yet been formally established.

  3. Summer 1971

    Fr Odran Callan starts the parish

    Fr Odran Callan was sent to begin the new parish. He lived on Sharoe Green Lane, where a house was bought as the presbytery, and said Mass in the homes of parishioners.

    A Sunday Mass could not be arranged until the first stage of the school was ready. In the meantime a class of children was taught at the Manor House, roughly where the Casualty Department of the Royal Preston Hospital stands now.

  4. 2 November 1971

    The school opens its doors

    Head Teacher Mr Edwin Fox brought 36 children (21 juniors and 15 infants) and two teachers from Our Lady and St Edward's to the new school, where Fr Callan welcomed them.

  5. 14 November 1971

    The first Sunday Mass

    The first Sunday Mass of St Clare's was celebrated in the school, which remained the parish's Sunday church until a temporary building was ready. There were two Masses, at 9:30am and 11am, with 134 and 86 people attending.

  6. 1972

    The temporary church

    The temporary church opened on 7 May 1972, in a hut that had been bought from the army camp at Weeton. Bishop Foley formally blessed and opened it on 23 July, in front of four hundred people.

    It was soon bursting at the seams, and permission was given to build a permanent church.

    Parishioners standing in front of the long, single storey temporary church building.
    The temporary church, photographed on 5 November 1978 as parishioners gathered for the blessing of the foundation stone.
  7. 5 November 1978

    The foundation stone is blessed

    Bishop Foley came to bless the foundation stone of the new church. Building work was already under way and the frame of the church was in place, but the Bishop's visit was the first dedication of the site as a house of God.

    The stone was later moved. For years it was covered by a notice board and forgotten, until the old porch was demolished in 2017 and it was rediscovered. It has since been restored and can now be seen inside the narthex.

    The Bishop in purple smiling as he arrives, with the steel frame of the church behind him.
    Bishop Foley arrives at the building site.
    Parishioners holding yellow and white ribbon streamers on the muddy building site.
    A great crowd gathered on the building site for the blessing.
    A large crowd seen from behind, facing the red steel frame of the church under construction.
    Parishioners gather in front of the steel frame of the new church.
    Brownies in brown uniforms and Guides in blue, holding ribbons, with a flag behind them.
    Brownies and Guides waiting for the blessing.
    A group of Brownies and Guides holding ribbon streamers and song sheets.
    Brownies and Guides at the blessing.
    Altar servers in red and white and clergy standing in front of scaffolding on the foundations.
    Clergy and altar servers gather beside the scaffolding.
    Priests and servers in white surplices lined up in front of the scaffolding, with the steel frame to the right.
    Clergy and servers at the foundations of the church.
    Clergy and servers in front of scaffolding, with the Bishop at the lectern on the right.
    The ceremony begins beside the scaffolding.
    Priests in surplices carrying books, with a large crowd of parishioners behind them.
    Priests join the crowd on the site.
    The Bishop wearing a mitre and an embroidered cope, standing among parishioners.
    Bishop Foley in cope and mitre among the congregation.
    The Bishop in mitre standing beside a priest reading from a red book at the lectern.
    The Bishop and clergy during the service.
    Clergy in vestments by the lectern, with the Bishop in cope at the foundations.
    The service in progress at the foundation stone.
    The Bishop in a cope beside the lectern, next to a boy in a dark suit, with the wall of the church at the right.
    Bishop Foley at the moment of blessing.
    A stone tablet set into the new brickwork, inscribed as blessed and laid by Bishop Foley on 5 November 1978.
    The foundation stone in place on the building site.
    The foundation stone with gilded lettering in a light wooden frame.
    The restored foundation stone, now displayed in the narthex.
    An Italian stone plaque on a wall in Assisi, dated 5 November 1978.
    The plaque in Assisi recalling Pope John Paul II's visit on the same day, 5 November 1978.
  8. 11 November 1979

    The new church is opened

    The permanent church and presbytery were finished in 1979. On Remembrance Sunday Bishop Foley celebrated Mass at 3pm, the first service held in the new St Clare's, and the church was packed.

  9. 1 June 1994

    The church is consecrated

    The church was solemnly consecrated.